The company About Bolin


2010
CEO Mr. Aerial Entered Tent Industry
2012
Co-founder Mr. Long from Fabric Structure to Tent Industry
2016
Found BoLin Tent, Started Own Business
2019
Build 5000+m² Processing Factory
2020
Build 1000+m² Sample Room
2021
Factory was expanded to 7000+m²
2022
Undertaken High-end Tented resorts @ French Islands
2023
Product 100+ Cocoon Tents For India Client
2024
Provide One-shop European Tented Resort Solution

Mr Aerial, graduated from the School of Engineering and Construction in 2009, entered the field of tent manufacturing management in 2012, and participated in the analysis and on-site production and construction process management of multiple 10 million-level projects from 2013 to 2024. Over the years, he has accumulated a variety of on-site and severe weather project construction management consulting experience.

The steel structure processing factory covers an area of 3,000 m2. It has a CNC intersecting wire cutting machine, pipe bending machine beveling machines and a finishing workshop with turning, milling, planing and drilling. The annual steel structure processing capacity is 10,000 tons. Our steel frames with hot-dip galvanized, hot painted surface treatments to ensure no rust.

The fabric processing factory covers an area of 4,000 m2 with advanced equipment, including fully automatic fabric cutting machine, high frequency heat welding machine, extra thick fabric sewing machine, etc. It has an annual processing capacity of 200,000 m2 of PVDF & PVC, and an annual processing capacity of 300,000 m2 of canvas & fabric.
Site Installation & Assembly Guide
Experienced technical supervisors, qualified assembly solutions and trained finishing artisans are provided, specific to the site and installation requirements.